GATE AG 2024 • Q56 NAT • 2 Marks

Section 4: Soil and Water Conservation Engineering

Hydrology

Subtopic: Analysis of precipitation data

Question Statement:

A catchment with 5 rain gauge stations recorded annual rainfall of 90, 100, 80, 120, and 110 cm, respectively. Considering 5 % error in estimation of the mean annual rainfall, additional number of rain gauge stations required is __________. (Answer in integer)

Official Answer Key:

5 to 5

Step-by-Step Solution & Explanation

Step 1 — mean annual rainfall: x̄ = (90 + 100 + 80 + 120 + 110)/5 = 500/5 = 100 cm Step 2 — standard deviation (sample, with n − 1 = 4 degrees of freedom): Deviations: −10, 0, −20, +20, +10 Σd² = 100 + 0 + 400 + 400 + 100 = 1000 σ = √(1000/4) = √250 = 15.811 cm Step 3 — coefficient of variation: Cᵥ = (σ/x̄) × 100 = (15.811/100) × 100 = 15.811 % Step 4 — optimum number of stations (IS 4987 / standard hydrology formula): N = (Cᵥ/ε)² where ε = permissible error = 5 % N = (15.811/5)² = (3.1623)² = 10 stations Step 5 — additional stations required: = N − existing = 10 − 5 = 5

Practice This in Real CBT Exam Interface

Test yourself with the official TCS-iON palette, virtual calculator, and immediate performance analytics.

Launch CBT Mock Test