GATE AG 2020 • Q60 NAT • 2 Marks

Section 4: Soil and Water Conservation Engineering

Surveying and Levelling

Subtopic: Types of levelling

Question Statement:

The underside beam of a railway bridge, a permanent Bench Mark with RL 85.168 m, is used for a leveling operation. The Back Sight (staff held inverted against the BM) = 3.645 m. For a Fore Sight of 1.523 m at a construction-site point, find its RL (m).

Official Answer Key:

80 to 80

Step-by-Step Solution & Explanation

Section 5: Irrigation and Drainage Engineering

Practice This in Real CBT Exam Interface

Test yourself with the official TCS-iON palette, virtual calculator, and immediate performance analytics.

Launch CBT Mock Test