GATE AG 2019 • Q62 NAT • 2 Marks

Section 5: Irrigation and Drainage Engineering

Irrigation Water Conveyance and Application Methods

Subtopic: Design of irrigation channels and underground pipelines

Question Statement:

Irrigation Water Conveyance and Application Methods: Design of irrigation channels and underground pipelines; irrigation scheduling; surface, sprinkler and micro irrigation methods, design and evaluation of irrigation methods; irrigation efficiencies. An irrigation stream of 27 L/s is diverted to a check basin of size 12 m × 12 m. Water holding capacity of the soil is 15% and average soil moisture content in the crop root zone before irrigation is 7.5%. Depth of crop root zone is 1.2 m, apparent specific gravity of soil is 1.5. Assuming no deep percolation loss, the irrigation time (minutes) required to replenish the root zone moisture to field capacity is ______.

Official Answer Key:

12 to 12

Step-by-Step Solution & Explanation

Net depth of water to be applied, dnet = (WHC − current moisture) × apparent specific gravity × root zone depth = (0.15 − 0.075) × 1.5 × 1.2 m = 0.075 × 1.5 × 1.2 = 0.135 m. Volume of water required = dnet × basin area = 0.135 m × (12×12) m² = 0.135 × 144 = 19.44 m³. Stream size = 27 L/s = 0.027 m³/s. Time = Volume/Flow = 19.44/0.027 = 720 s = 12.0 minutes. Answer: exactly 12. Section 6 — Agricultural Process Engineering

Practice This in Real CBT Exam Interface

Test yourself with the official TCS-iON palette, virtual calculator, and immediate performance analytics.

Launch CBT Mock Test