GATE AG 2014 • Q47 MCQ • 2 Marks

Section 2: Farm Machinery

Farm Machinery

Subtopic: Calculation of performance parameters – field capacity, efficiency, performance index, application rate and losses

Question Statement:

A cultivator with a working width of 1.2 m utilizes 95% of its width due to overlapping while operating at a forward speed of 2 km h⁻¹. If the time lost in turning and other interruptions is 50 minutes per hectare, the field efficiency of the cultivator in percent is

Options:

  • (A) 79.84
  • (B) 83.34
  • (C) 86.97
  • (D) 90.20

Official Answer Key:

A

Step-by-Step Solution & Explanation

Theoretical field capacity (rated width): C_t = W·S/10 = (1.2×2)/10 = 0.24 ha/h → theoretical time for 1 ha = 1/0.24 = 4.1667 h = 250.0 min. Effective (utilised) width = 0.95×1.2 = 1.14 m → effective capacity = (1.14×2)/10 = 0.228 ha/h → operating time for 1 ha at effective width = 1/0.228 = 4.386 h = 263.16 min. Adding the 50 min/ha lost in turning: actual total time for 1 ha = 263.16 + 50 = 313.16 min. Field efficiency = (theoretical time / actual time) × 100 = (250.0/313.16) × 100 = 79.84%. Answer: (A).

Practice This in Real CBT Exam Interface

Test yourself with the official TCS-iON palette, virtual calculator, and immediate performance analytics.

Launch CBT Mock Test